Hot Mix Plant Working

Depending on the environmental conditions and the distance from the hot mix plant to the project, hot mix asphalt can lose between5f and25f.The temperature of the mix on the base after it has passed through the lay down machine not the mix or manufacturing temperature is the most important factor in determining the available time.